USAfixTM - Repair Guide (RG) - Master Email RG
- Check for power to the solution pumps
 Level of Difficulty - HIGH  Estimated Completion Time - 15 minutes
TASKI - SWINGO 1850

Tools Required
Tool 
Ratchet-Socket metric 13mm
Volt meter (True RMS capable)

Parts Required


Step Procedure & Parts & Tools
1 OPEN TANK TO ACCESS THE POWER BOARD TOWARDS THE REAR OF THE BASE
Ratchet-Socket metric 13mm

2 LOCATE THE SOLUTION PUMP WIRING AT THE POWER BOARD. THE RED PINS ARE FOR PUMP 1, THE GREEN PINS ARE FOR PUMP 2. PROBE EACH PAIR SEPARATELY WHILE ENGAGING THE SOLUTION SYSTEM.

3 TO ACTIVATE THE SOLUTION SYSTEM, DROP THE DECK, SET THE SOLUTION LEVEL ON THE DASH, AND ENGAGE THE DRIVE FWD.

4 PUMPS RUN ON A PULSED DUTY-CYCLE. THE VOLTAGE WILL NOT BE CONSTANT, IT WILL JUMP UP AND DOWN. THIS PARTICULAR METER HAS A BAR GRAPH THAT WILL MOVE BACK AND FORTH WITH THE PULSE, OTHERS MAY VARY.
Volt meter (True RMS capable)